The Stage in the Mine

Deep down in one of the mine’s most magnificent chambers awaits a stage unlike any other.

In one of the mine’s most grand and beautiful halls, this jewel sits with its own adjacent dressing room (the Lodge). The chamber above the stage has a ceiling height of approximately 20 metres. The stage was completed in 2020 and took three years to build. With a combination of smooth and angular rock surfaces, the acoustics here are close to perfect.

Whether you want to arrange your own event or have us arrange it for you – concert, lecture, theatre – only your imagination sets the limit.

The stage together with the mine is perfect for those who want a larger event in our unique setting: kickoffs, theatre, magicians, fire shows or live bands. There is space for 400 seated / 500 standing guests, and behind the audience lies a crystal-clear, illuminated underground lake.

The stage must be experienced in person to understand just how powerful it is.

Facts

Capacity & uses

  • 400 seated / 500 standing
  • Perfect for concerts, theatre, lectures, magicians, fire shows, corporate events, kickoffs and more.
  • Adjacent dressing room (the Lodge) with direct views of the illuminated mine lake.

Technology

  • Rock walls and ceiling: 64 × 38W RGB LED
  • Stage floors: 16 × 80W RGBW LED plus 4 × 72W LED UV lights
  • Ceiling lighting: 3 × 600W LED floodlights
  • 2 × 2-way loudspeakers ElectroVoice EVH-1152D 3”+15”
  • 4 × subwoofers ElectroVoice DVX3159 2×15”
  • 4 × power amplifiers Dynacord C3600FDI, total power 14,400W RMS

We can also provide larger sound and lighting systems if desired.

Pyrotechnics

We have our own pyrotechnician who can help with everything from spark fountains to gasoline bombs.

Acoustics

The rock chamber is very large—20–40 metres high—and extends hundreds of metres in all directions through openings and passages. The rock surrounding the stage floors is hard, with a mix of smooth and angular surfaces. The acoustics are often described as a blend of an open-air stage and a church. The reverberation time is approximately 4 seconds.

Network & Wi‑Fi

A fibre connection of 250/250 Mbit/s, upgradeable to 1000/1000 Mbit/s. On all stage floors and up in the Lodge, there are access points for a password-protected Wi‑Fi network.

Electrical system

The stage is supplied with 100A. Each floor is equipped with 6 outlets, each with 1 × 3‑phase 16A plus 4 × single‑phase 10A. Around the rock chamber there are approximately 15 additional outlets with 3‑phase 16A and single‑phase 10A. All outlets have individual RCDs. All power cables, including speaker cables, are shielded and routed in separate channels.

The Project

Building a stage 80 metres underground is no ordinary construction project. In one of the mine’s most magnificent chambers, with a ceiling height of around 20 metres, work began to transform a simple gravel slope into a full-scale performance venue. With EU support via the Dalälvarna development area, the team dared to invest in a project that combines culture, adventure and industrial history in a way that hardly exists anywhere else.

Over several years, materials were carried, winched and installed down into the mountain. Everything had to work in an environment that is humid, cold and completely surrounded by rock. The result is an underground stage with near-perfect acoustics, where the reverberation is described as a blend of a church interior and an open outdoor stage. Today, everything from opera and choral music to electronic concerts, theatre and fire shows can take place here—set against a crystal-clear, illuminated mine lake and an audience that quite literally stands inside the mountain.

The project is proof of how four people, with limited resources, can create something truly unique. Now it is up to the artists to carry the torch forward.

The build in numbers

  • 6,400 metres of drill holes
  • 51 tonnes of timber
  • 1,400 kg of explosives
  • 11 tonnes of logs
  • 2,500 tonnes of rock
  • 32,000 screws
  • 62 metres of tunnel
  • 4,500 metres of cable
  • SEK 2.4 million in EU support through LEADER
  • SEK 2.0 million from Adventuremine

Team & partners

Key people in the project:

Daniel Karlsson (Project Manager)
Mattias Bengtsson (Blasting Supervisor)
Marcin Wojturski (Master Painter)
Stefan Olsson (Stair Builder)
Tobias Eriksson (Technician)
Aron Juhlin (Stage Expert)
Anders Sörell (Fire Safety Consultant)

Also:

Christer Grufman
Zacharias Eric Vindbacke
Reza Amini
Merrick Belding
Thomas Berggren
Wera Finn Eriksson
Marcus Dammgård
Emelie Gustavsson
Simon Almén and Boney (buried during the project period).

Partners:

Belo Elektriska AB
Ahlsell AB Borlänge
LB Maskiner
AB Karl Hedin Borlänge
Sahlins Struts
Riksteatern
Tuna-Hästberg Local Heritage Association
Sensus Study Association
DUO Dalälvarna
Electro‑Voice